Traffic Signal and Intersection Road Design Studies on the Island of Rhodes

2025/03 - On going
The scope of the study concerns the preparation of a comprehensive traffic and transportation study for 27 intersections in the area of Rhodes, aiming at their functional upgrading, the enhancement of road safety, and the optimal traffic management throughout the year.
Within the framework of the study, traffic volume counts and turning movement surveys were conducted during both the summer and winter periods, in order to capture the significant seasonal fluctuations that characterize a highly touristic destination such as Rhodes.
Based on the analysis results, traffic signal plans were developed for 15 intersections. In parallel, final road design studies were prepared for all 27 intersections, including geometric interventions and operational improvements, as well as final signage and safety studies, aiming to enhance road safety, provide clear guidance to road users and reduce the risk of accidents.

Main Services Provided by Polinde

  • Traffic surveys (turning movement counts and traffic volume surveys) during the summer and winter periods
  • Capacity analysis (Level of Service – LoS)
  • Traffic signal plans for both summer and winter periods
  • Detailed road design studies for intersections
  • Final signage and safety studies for intersections
Client:
LERIAS GRIGORIOS ATE
Beneficiary:
Region of South Aegean
Project No: 487 & 1014
Contract Value (€): 187.600,00
Caried out by Polinde: 100%
Country: Greece
Region: Dodecanese Islands
Transport
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.